|
Photograph Archives for March 2007

One of the first areas for construction is between the
Emergency Room and the hospital entrance. A temporary sidewalk has been
installed for easy access between them. The courtyard by the Emergency
Room remains open.
(March 24, 2007)

The interior loop road on the west side of campus is closed in both directions between the Dan B. Moore Building and the loading dock. It will re-open at the end of July. In addition, the loop road near the main medical office buildings is restricted to eastbound traffic only.
(March 24, 2007)

The parking lot in front of the Emergency Room is closed
while work is being done to re-align the interior loop road. As a service
to patients and visitors during construction, free valet service is
available at the entrance of the Emergency Room.
(March 24, 2007)
Return
to Expansion Photographs
|